ODM Precision Machined Components Service – All series of machining manufacture – RAISING-Elec

Short Description:

Material: Cr12 45# steel Processing equipment: wire cutting, precision lathe processing Accuracy requirement: 0.01mm   Gear parallelism requirement: 0.02mm Surface treatment: blackening, high level treatment, vacuum treatment Machining scope of Raising:  1. Precision machining. 2. Precision equipment parts processing. 3. Processing of non-standard spare parts. 4. Machining of precision special-shaped parts. 5. Hardware and mechanical parts processing. 6. Surface treatment of various mechanica...


Product Detail

Product Tags

Related Video

Feedback (2)

We've numerous great employees customers excellent at promoting, QC, and working with kinds of troublesome difficulty inside the generation method for Stainless Steel Torsion Spring, Terminal Stamping Customization, Metal Stamping Machine Parts, By more than 8 years of company, now we have accumulated rich experience and advanced technologies from the generation of our merchandise.
ODM Precision Machined Components Service – All series of machining manufacture – RAISING-Elec Detail:

Material: Cr12 45# steel

Processing equipment: wire cutting, precision lathe processing

Accuracy requirement: 0.01mm   Gear parallelism requirement: 0.02mm

Surface treatment: blackening, high level treatment, vacuum treatment

Machining scope of Raising: 

1. Precision machining.

2. Precision equipment parts processing.

3. Processing of non-standard spare parts.

4. Machining of precision special-shaped parts.

5. Hardware and mechanical parts processing.

6. Surface treatment of various mechanical parts.


machining 12

Design datum: the datum used to determine the position of other points, lines and planes on the part drawing is called design datum.

Process benchmark: the benchmark used in the processing and assembly of parts is called process benchmark. Process datum can be divided into assembly datum, measurement datum and positioning datum according to different purposes.

(1) Assembly datum: the datum used to determine the position of parts in components or products during assembly, which is called assembly datum.

(2) Measuring datum: the datum used to check the size and position of the machined surface is called measuring datum.

(3) Positioning datum: the datum used for workpiece positioning during machining, which is called positioning datum. As for the surface (or line or point) as the positioning reference, only the raw blank surface can be selected in the first process, which is called coarse reference. In each subsequent process, the machined surface can be used as the positioning reference, which is called fine reference[ 2]


General Introduction (4)


General Introduction (5)


General Introduction (6)


General Introduction (3)


General Introduction (2)


General Introduction (1)

● Wire-EDM : 6 Sets

● Brand: Seibu & Sodick

● Capability:  Roughness Ra<0.12  / Tolerance +/-0.001mm


Tooling Shop Extended in 2020  (1)


Tooling Shop Extended in 2020  (1)


Tooling Shop Extended in 2020  (2)

● Profile Grinder: 2 Sets

● Brand: WAIDA

● Capability: Roughness <0.05 / Tolerance +/-0.001


Tooling Shop Extended in 2020 (1)


Tooling Shop Extended in 2020 (2)


Product detail pictures:

ODM Precision Machined Components Service –  All series of machining manufacture – RAISING-Elec detail pictures


Related Product Guide:

We insist over the principle of enhancement of 'High high quality, Efficiency, Sincerity and Down-to-earth working approach' to offer you with superb assistance of processing for ODM Precision Machined Components Service – All series of machining manufacture – RAISING-Elec , The product will supply to all over the world, such as: Chicago, Boston, Ukraine, We've been consistently broadening the market within Romania in addition to preparation punching in extra premium quality merchandise connected with printer on t shirt so that you can Romania. Most people firmly believe we've the whole capacity to provide you happy solutions.
  • The sales manager is very patient, we communicated about three days before we decided to cooperate, finally, we are very satisfied with this cooperation!
    5 Stars By Helen from Norway - 2018.08.12 12:27
    We are long-term partners, there is no disappointment every time, we hope to maintain this friendship later!
    5 Stars By Arabela from Iran - 2018.07.26 16:51
    Write your message here and send it to us